Pool Installation #1 Posted on March 23, 2014 by BJ Tipton Measurements are made and the pool site is laid out Digging is underway Pool walls being erected Walls are up and coping is starting to be attached to the top of the walls Footer is poured Ready for plumbing Backfilled and ready for concrete Cement forms built The hard bottom is underway Hard bottom done in the hopper Hard bottom complete, liner installed, and water added. Ready to swim Ready to swim!!